Maintenance Guides / HVAC & Air Quality

Schedule geothermal system service

Difficulty: call_a_proTime: 90 minsEst. Cost: $150 - $300

Why it matters

Geothermal systems are incredibly efficient but require specialized service. A loop pressure drop means a leak that can't fix itself. The compressor and heat exchanger need annual checks to maintain the 15-20+ year lifespan these systems are designed for.

Stop forgetting to do this.

Hearth generates a personalized maintenance schedule so you never miss another schedule geothermal system service.

Get the App

How to do it

  • 1

    Find a geothermal-certified HVAC technician (not all HVAC companies service ground-source systems).

  • 2

    Schedule service in spring before cooling season.

  • 3

    The technician should check loop pressure and antifreeze concentration.

  • 4

    They'll inspect the compressor, heat exchanger, and electrical connections.

  • 5

    Ask for a written report of loop pressure readings — compare year over year.

  • 6

    If loop pressure has dropped significantly, there may be a ground loop leak that needs repair.